Hospital Installation 2024

At a glance

A large hospital trust in the East Riding of Yorkshire region needed to replace their existing generators with a more suitable solution combining – fully synchronisation, automatic fuel integration, easy load bank connectivity and remote monitoring to name just a few of the bespoke options, we worked with the client to fit.

Challenges

Reliability, serviceability and connectivity were the key issues that emerged from our initial planning meetings. Working with the Hospital and contractor project team, together we devised a solution that met the exacting needs of the trust.

Solutions

Due to space constraints the project started with commissioning the build of 3 x 700 kVA.

Bespoke Options:

  • Individual Automatic Fuel Transfer System.
  • Automatic Lube Oil Top-Up System for longer run time.
  • Run-up-Synchronisation System – Power cut to on full load – 5 seconds.
  • Individual Load Bank Connection Points with Shunt Trip Configuration.
  • Extended DEFRA Compliant Bunded Base Tanks.
  • Highly Efficient Engine Coolant Heater System.
  • Bespoke Exhaust Kit for Integration to existing Silencer System.

The implementation of remote monitoring enables continuous oversight of generator performance, allowing both the client and our technical team at JS Powers to promptly address any issues, round the clock.

For further details about our services, please explore our website or get in touch with our team today to discuss your generator requirements. With over 60 years of experience, there’s no challenge too daunting for us to handle. Contact us at +44 (0)1482 222 565.