Case Studies

Hybrid Installation

Our client required a continuous power supply for a large off grid Carp fishing lake in East Yorkshire. After reviewing site load calculations and taking into account the clients concerns for environmental impacts, it was recommended that a full hybrid package would be the best solution. The hybrid package offered the client a high efficiency power solution, lower maintenance/running costs, a reduced environment impact, designated quiet time running and improved reliability with full system monitoring. 


The Hybrid system was installed in a secure shipping container and fully configured and tested at JS Power HQ before delivery to site. After a full system installation was carried out, a JS Power Commissioning Engineer attended site to carry out the final system test and onsite training before final handover to the client.  tank. The generator also comes with a DEFRA compliant extended base tank which allows the client to run for longer in a power cut without the need to refuel.

For more information on our diesel / bio diesel generator range feel free to browse our website or call our team on 01482 222 565.

blank

Related Case Studies

University

Radio Communication

Education Materials Manufacturer

blank

Here to help

If you require more information on any of our top-quality generators, then feel free to give us a call on 01482 222 565 and speak to a member of our team.

blank
blank

Call +44 (0)1482 222 565